Manchester Airport Group – Stansted Terminal Expansion Works London

Delivering secure access and smooth integration

THE ASPIRATION
Enabling secure, seamless access

Manchester Airport Group (MAG) needed two new facilities at Stansted Airport to support its terminal expansion: a Landside Office for processing construction personnel and a Contractor Verification Point for secure airside access. These had to be delivered within a highly regulated, live airport environment. ensuring smooth operations while navigating tight site constraints, including roadways, existing infrastructure and the airside boundary.

OUR RESPONSE
Multidisciplinary expertise

We provided Project and Cost Management alongside multidisciplinary design expertise, overseeing the development of both facilities. Leading the design process, we ensured full compliance with operational and security requirements while minimising disruption to airport activities.

With strict Aviation Security in Airport Development (ASIAD) regulations and multiple stakeholders – including MAG’s Security, Environmental and Operations teams – effective coordination was essential. We played a key role in managing these relationships, fostering clear communication and ensuring all designs met MAG’s compliance expectations.

To overcome site constraints, we strategically positioned the new facilities to avoid major service diversions, reducing costs and minimising operational impact. Our phased construction approach kept the airside boundary secure, while collaboration with MAG’s Environmental team led to a smarter, cost-effective surface water attenuation solution that maintained both safety and compliance.

THE RESULT
A secure and efficient access point

The project is on track to deliver a fully integrated, secure access facility that streamlines personnel processing while keeping airport operations running smoothly. Our phased construction approach has maintained the integrity of the airside fence, minimising security risks.

THE LASTING IMPACT
Supporting expansion with minimal disruption

Our strategic planning and close collaboration with stakeholders have ensured a smooth project execution in a highly regulated, operationally sensitive environment. By optimising the site layout and challenging initial requirements, we delivered a cost-effective, compliant solution – supporting the expansion of Stansted Airport.

Find out more about our multidisciplinary services at Ridge.

  • Supporting

    Smooth terminal expansion

  • Phased

    Construction

  • Security

    Compliance

Related projects